Sir your cameramen is very bad in his profession In all videos he is shifting the camera focus which is disturbing the focus a lot
@novendraanon3181
5 жыл бұрын
how to find the actual pouring time ?
@wowmath5691
2 жыл бұрын
very clear and precise
@tarunv279
Жыл бұрын
Ht has been taken wrongly for the top gating system as well.
@sandipmanna3526
4 жыл бұрын
Bad presentation
@ak20011972
4 жыл бұрын
If DCM is 15 year old , then how can improve in cycle time of machine
@satishkumar-jh6ys
4 жыл бұрын
Your lecture is not clear
@uchanhinh4294
4 жыл бұрын
Poor lecture. You are calculating the pouring time based on the gating system, but how can you got the parameters of the gating system? In fact, the input of gating system design is the pouring time. From the puring time, you can calculate the flow rate, and then calculate the parameters of the gating system. The pouring time should be selected so that there is no solidification happen before the mold are fullfill.
@niza3470
10 ай бұрын
If you have the parameters for the gating system you can calculate pouring time. 🤷 I don't understand what your problem with the video is
Пікірлер: 10