In this part I will install and cable all the @VictronEnergyBV hardware and power up the all the solar components, allow a charge cycle to complete and then transfer all equipment off the existing AC supply across to the AC Inverter on the Solar System.
If you haven't seen Part 1 - we took a look at the system design and some of the selected hardware, you can find that video here:
• Project POWER! Part 1 ...
Victron Energy equipment in the build:
Smart Solar MPPT 100/30 charge controller
Battery Balancer
Smart Battery Protect 65A
Smart Battery Protect 220A
Smart Shunt 500A
Orion-TR Smart 24 | 12 - 30
Phoenix Inverter 24 / 1200VA
Solar Panels
2 x JSSolar 380W
Batteries
2 x 12v 200Ah
----------------------------------------------------------------------------------------------------------
I upload my images to Telescopius, and you can find my profile at:
telescopius.co...
My other social locations are;
www.daves-astr...
/ daves.astrophotography
/ daveauld
/ dave_auld
The main equipment I use is;
Celestron CGX mount
Celestron CGX-L mount
Celestron Edge 11
Celestron RASA 11
Lunt LS80MTB1800C Solar Scope
Bresser 8" Newtonian
Bresser AR90s/500
ZWO ASI2600MC-P Colour cameras
ZWO 60/280 guidescope
ZWO ASI120mm guide camera
ZWO ASI174mini guide camera
ZWO ASI174mm planetary camera
Unihedron Sky Quality Meter (SQM)
NexDome Observatory
#Astrophotography #DavesAstrophotography #Cyprus
Негізгі бет Project POWER! Part 2 - System Install and Power Up!
No video
Пікірлер: 9