Join this channel to get access to perks:
/ @periscopefilm
Want to learn more about Periscope Film and get access to exclusive swag? Join us on Patreon. Visit / periscopefilm
Visit our website www.PeriscopeFilm.com
This Quarterly Report from NASA looks at the progress made towards manned spaceflight between April and June, 1965. It covers the operations of the Gemini Program, Apollo Saturn Development, Apollo Saturn manufacturing, facility construction, and space environment investigations. It features extensive footage of the construction and testing of different equipment, particularly with a focus on new infrastructure at Cape Canaveral needed for the Apollo Missions.
0:08 NASA Logo, 0:14 “Manned Space Flight” 0:21 “Quarterly Report No. 9 April, May, June 1965”, 0:25 a Gemini rocket on the launch pad, 0:43 astronauts going up an elevator to board the rocket, 0:58 a Saturn V rocket, 1:18 a rocket flying after launch, 1:30 “Gemini Manned Flight Operations”, 1:34 Jim McDivitt and Ed White in the capsule and then being launched in Gemini 4, 2:29 Ed White doing a spacewalk, 2:54 inside of the mission control at the Goddard Space Flight Center, 3:39 footage of the earth from space, 3:56 McDivitt and White being picked up and dropped on the USS Wasp after reentry, 4:07 both astronauts going through post flight evaluation, 4:18 outside of the Houston Mission Control Center, 4:31 inside of the control centers including mission control, communications, calculation, and simulation, 5:18 the early Mercury control center, 5:40 the Gemini 5 capsule being delivered, 5:57 engineers working on the capsule, 6:40 “Apollo Saturn Development”, 6:53 Apollo launch subsystem being tested at White Sands but beginning a roll and breaking up after a while, 7:57 launch escape system being successfully tested at White Sands, 8:16 ground test vehicles at a white room at the Grumman Company, 9:19 the Saturn V first stage being tested at full thrust, 10:10 Saturn V second stage being tested at full thrust, 10:37 Saturn V third stage being tested at full thrust, 11:08 “Apollo Saturn Manufacturing”, 11:30 Saturn V capsule being moved in a factory, 11:52 Saturn 1B being tested, 12:37 elements of the Saturn 1B being moved, 12:57 technicians working on the Apollo Saturn V, 13:13 Saturn V stages under construction, 13:48 “Facility Construction,” 13:58 construction of a static firing stand, 14:19 JFK Space Center Complex, 14:28 completion of steel framework of Saturn V assembly building, 14:51 testing of the Saturn V crawler transport, 15:39 “Space Environment Investigation”, 15:43 “Project Fire” mission space craft launch, 16:29 a Pegasus satellite being launched by a Saturn I rocket at night, 17:34 a pool of new astronauts in front of the press, 17:46 summary footage of what has been seen so far,18:20 NASA Logo
Project Gemini was NASA second human spaceflight program conducted from 1961-1966. Gemini's objective was the development of space travel techniques to support the Apollo mission to land astronauts on the Moon.
Motion picture films don't last forever; many have already been lost or destroyed. For almost two decades, we've worked to collect, scan and preserve the world as it was captured on 35mm, 16mm and 8mm movies -- including home movies, industrial films, and other non-fiction. If you have endangered films you'd like to have scanned, or wish to donate celluloid to Periscope Film so that we can share them with the world, we'd love to hear from you. Contact us via the weblink below
This film is part of the Periscope Film LLC archive, one of the largest historic military, transportation, and aviation stock footage collections in the USA. Entirely film backed, this material is available for licensing in 24p HD, 2k and 4k. For more information visit www.PeriscopeFi...
Негізгі бет “QUARTERLY REPORT NO. 9” 1965 NASA FILM MANNED SPACEFLIGHT REPORT GEMINI & APOLLO PROGRAM XD17264
Пікірлер: 29