FCC Construcción has completed the roof construction of the Wanda Metropolitano, consisting of lower traction ring, a superior traction ring and the radial rings of the membrane covering the steps of Wanda Metropolitan. The roof is made up of 720 PTFE panels (polytetrafluoroethylene) that will make up the 83,000 square meters of roof surface.
The placement of the radial membrane is located 40 meters above the ground, by unwinding operation, tensioned and installed panels both traction rings. The steel structure has a weight of 6,336 tons and is tensioned with radial cables attached through the membrane. The material of which the membrane is composed is translucent in 35%, which will favor the illumination of the stands.
Негізгі бет Ғылым және технология Roof construction of the Wanda Metropolitano
Пікірлер: 2