Please show how to do a warm pitched roof with the counter batten. Awesome video
@m163
8 ай бұрын
God, thank you for making it so clear and easy to follow, thank you guys.
@CC-vw2ic
Жыл бұрын
The only fells on KZitem explaining. Cheers fella
@Reddwarf1994
Жыл бұрын
Personally I don't put my felt trays on before I fix my first batten. Measuring off a bare fascia board is more accurate. Once the first batten is fixed lift the bottom of the membrane up and then fix the trays.
@thedarkhugheshughes2640
26 күн бұрын
100% right the first course is the most important course get that wrong and the lot is fucked
@Mt3Dpdrtk
Жыл бұрын
10mm nominal drape - you learn something new every day
@robertslater5706
Жыл бұрын
Fantastic. Thank you.
@user-uk3xc3vv1x
Ай бұрын
Whats the thoughts on throwing the top felt over the ridge, seen some other videos where the felt finished at almost the rudge to allow ventilation
@Reddwarf1994
26 күн бұрын
@user-uk3xc3vv1x when using a dry ridge system leave a 20-30mm gap at the top on both sides to allow the airflow through the apex. This applies to breathable and non-breathable felt. Also if the soffit isn't already vented over facia vent is required for airflow under the eave course.
@don1mark
6 ай бұрын
Get your length of the slate, take off your headlap (3 inches) and half the measurement that’s your gauge! Example a 24x12 slate 24 - 3 (your headlap) = 21 then half that 10.5 so 10.5 is your gauge always subtract 3 inches from your slate length
@ianstevens9655
Жыл бұрын
Wow the i dear is good but needs to explain why you are doing it. Slates are sorted into a grade to get max use out of the slates. Thin at the bottom would where out before the top. Because of the water run of. 😢
@Morning_Rays
11 ай бұрын
Hi thank you for the wonderful instructional video. I noticed your support tray is lifted up above the facia board. Why is this required and how much lift is required?
@serbancatalin1875
Жыл бұрын
The lap needs to be tape
@Mt3Dpdrtk
Жыл бұрын
What’s this gap against the wall all about then? I pin the felt to the wall with the batten; providing a secure channel for any water ingress (but carefully as to not damage the felt).
@edwarddevon5499
Жыл бұрын
I can see that you put the batten up to the line. So thats the first full slate batten. Can you please tell me the distance from the top of that first batten to the eve because i havent got a clue what you are saying
@serbancatalin1875
Жыл бұрын
It's this NHBC standards?
@serbancatalin1875
Жыл бұрын
To fix the felt NHBC no allowed nails now
@don1mark
6 ай бұрын
That’s a really long way round getting your gauge
@danielserban9419
Жыл бұрын
Where's thr over fasci vent?
@jordy798
Жыл бұрын
where you get that chalk line?
@Mt3Dpdrtk
Жыл бұрын
Eeeeevryone got that chalk line, roofing suppliers
@donaloconnor3352
Жыл бұрын
Why is there a double batten at the bottom of the roof?
@carlrhodes3421
Жыл бұрын
For the eaves course
@donaloconnor3352
Жыл бұрын
@@carlrhodes3421 could you explain why two are needed for that?
@carlrhodes3421
Жыл бұрын
Slates are laid double lap. i.e. each slate covers the heads(top edges) of the slates on 2 courses below. The eaves course serves as the second head for the second full course of slates to cover to keep water out.
@mintymintygogo
9 ай бұрын
You haven’t explained how to work out the gauge without explaining how you worked out your head lap or explained what a double lap means - also your first slate overhang is 65mm but everyone else says 50mm. Why have you got this wrong? Also no explanation of where the bottom of the first row of membrane sits- I’m slating a roof for the first time today and it’s hard to find a video with the information I actually need!!
@markwoods1130
8 ай бұрын
When did you leave the star ship Enterprise 😂😂😂
@user-ku4un2kk4t
8 ай бұрын
It would be nice to have the time to make sure you have exactly 10mm drape between every truss using a template. Unfortunately in the real world where time is money and the money isn't on the job you don't get this privilege.
@mattydeathgoon
9 ай бұрын
As a roofer. he so old school he doesn't know what he's on about anymore. Gauge stick lol 😅😅 . We call it an idiot stick.
@3.142-x3b
2 ай бұрын
Well, depends who you're working with. Me? I'm only just getting back into roofing after a long time and would like to use he gauge batten; once you've finished them then measure back to the datum.
@thedarkhugheshughes2640
26 күн бұрын
😂😂 I’m also a roofer I’d have that roof felt lathed and slated in that 15 minute video 😂