Now that the outer structure of the RV Home Base is erected it is time for us to work on roughing in the floors and walls of the RV Home Base Living Quarters. We put in a sub floor ,framed the interior walls using metal stud framing materials. while waiting for some repairs we installed a drainage a=system an had asphalt driveways poured.
Негізгі бет RV HOMEBASE LIVING QUARTERS
Пікірлер: 14