Werewolf Graphics: www.werewolf.com.au
Production of crushed iron ore from the Savage River open cut mine totals 0.649 million tonnes annually, with 2.4 million tonnes of pellets being produced at Port Latta. Magnetite concentrate is pumped from the mine site to the pellet plant via an 85 km long pipeline. A feasibility study completed in 2006 showed that mine life could be extended to 2018, with closure of the project in 2022. As part of this program a new in-pit workshop was constructed and new mining equipment was purchased.
Негізгі бет Savage River Quarry blast
Пікірлер