Our commitment to excellence is reflected in the installation of two new high-efficiency extrusion lines. A leap forward into the future for engineering thermoplastic compounds. The two new production lines are designed to optimise processes and increase the volume of finished product.
Where did we start from?
A highly engineered two-storey steelwork structure was built based on reinforced concrete slab foundations to guarantee stability and designed to reduce the number of columns present, facilitating extrusion operations.
Secondary tunnels in the slab accommodate the general adduction systems to the extruders. Interlocking joints in the metal structure minimise the use of bracing, simplifying the overall design. A recessed grating maximises inter-floor heights, optimising the available vertical space.
The designed solution offers unprecedented flexibility in space. The installation of extruders, feeders and raw material supply units is now efficient and functional on both levels, thanks to a design never seen before.
This step is a demonstration of our constant will to innovate and offer a high quality finished product.
📽️ Enjoy!
Негізгі бет See with your own eyes the evolution of our production site! 👀
Пікірлер