Its a nice video. Good expalanation. Kindly share spread sheet
@ekay10
6 ай бұрын
Please why did you use your first PE (65) instead of the total PE (353) in your peak flow factor calculation? Wonderful video by the way, by far the most detailed explanation out here.
@spaceblurz
Жыл бұрын
Assalamulaikum Dr. Usually I used Colebrook-white equation for sewerage design for IWK. Is it any significant difference between Colebrook-white equation and Manning equation? Thank you
@gametricks9409
4 жыл бұрын
Thank you so much Sir for sharing this video. Loved it!
@atangpeolwane1143
3 жыл бұрын
do u have the lisp files for the profiles section
@LuSin-ti3pr
Жыл бұрын
Great video!
@marsylthietimothy-9459
2 жыл бұрын
Hello sir. May i ask where do you get the Ground Level Value in the proposed layout plan?
@samhamidmylife3834
2 жыл бұрын
Ground level value from the survey plan and proposed level in earthwork drawing
@gametricks9409
4 жыл бұрын
Sir, nak tanya, the depth of IL and OL cannot exceed 12m ke?
@nnnseven
Жыл бұрын
Dr nk tny. apa beza GL start dgn GL end.. apa beza GL diff dgn level drop
@mohdsamsudinabdulhamid3295
Жыл бұрын
GL start is where the sewerage line start and gl end is where the sewerage line end. GL diff is different between start and end level. Drop level is different between end level and start level at the point or grid.
@MOATHALSHIBLIvfx
4 жыл бұрын
thank you so much for this lecture... are there more of this series?
@mohdsamsudinabdulhamid3295
4 жыл бұрын
Later on maybe.
@MOATHALSHIBLIvfx
4 жыл бұрын
@@mohdsamsudinabdulhamid3295 great >> thank you so much
@opticalgrid8497
2 жыл бұрын
Wa 'alaikum salaam wa rahmatullaahi wa barakatuh
@tafadzwamatutu2821
6 ай бұрын
Can you please share the excel spreadsheet
@syazanuwairah97
4 жыл бұрын
Good sharing!
@mohdsamsudinabdulhamid3295
4 жыл бұрын
Thank you! Cheers!
@enzille
4 жыл бұрын
How can one get a copy of this report sir?
@mohdsamsudinabdulhamid3295
3 жыл бұрын
i dont have the copy of the report. it just a lecture slide for my student.
Пікірлер: 23