Great vid - thanks for taking the time to post it.
@pauljamieconstruction1871
Жыл бұрын
Thank you , and no problem
@carlhosker1544
2 жыл бұрын
A pleasure to watch that! Explained well throughout.👍 Everyday a school day.!Thanks boys.
@pauljamieconstruction1871
2 жыл бұрын
Thanks carl. We are glad you found value from it. Plenty more coming so make sure to subscribe
@Av3staxx
Жыл бұрын
Thank you very much that was really helpful
@pauljamieconstruction1871
Жыл бұрын
Im glad you found this video helpfull
@sajulldin5147
2 жыл бұрын
Lovely job, some great ideas and pointers for my own project which I'm undertaking myself. Just struggling to get a structural engineer to provide the advice I need to commence !
@pauljamieconstruction1871
2 жыл бұрын
Thankyou. Check out my latest video we did 6 steels all sunk in ceiling.
@sajulldin5147
2 жыл бұрын
@@pauljamieconstruction1871 watching them right now
@briangadsby6653
2 жыл бұрын
Good job , We generally have a beam With a 300x8 plate welded to the bottom with equal overhang on each side and cut a notch on bottom of existing floor joists and let them sit on the plate ,no need for the beam fill timbers or joist hangers as they can't be wrapped over the top and fixed where there's limited room
@pauljamieconstruction1871
2 жыл бұрын
Thanks Brian, i have seen that bottom plate done by A & E construction like that, knocking joists on 1 side. Thats a very good idea using it on a job like this one. Great feedback
@mikew151Manhattan
2 жыл бұрын
solid work boys - amazing what you can achieve in a single day!
@pauljamieconstruction1871
2 жыл бұрын
Thanks mike , im glad the video lools fluent enough but i have a confession this took 1 days to remove the wall, and 1 day to install RSJ. The RSJ was fabricated the day we knocked the wall. 🙈
@TheNorthernmunky
Жыл бұрын
Awesome
@Happyfishcake
Ай бұрын
What happened with the pipes that appear to have originally crossed over the beam area?
@pauljamieconstruction1871
Ай бұрын
Hi , we drill holes through the rsj if any services need to pass through. Which 9 times out of ten they do. I hope that helps
@attilagal6672
Жыл бұрын
Impressive work! But, how did you guys know the length of the posts? I saw they were already pre-welded with top-bottom plates. How did the steel manufacturer know the exact measures? Also, I-ve got the same job here in Bucks. Can you guys do it?
@pauljamieconstruction1871
Жыл бұрын
Hello mate, you have to knock the wall down first and expose the foundation, then measure from foundation to ceiling. Then minus the spaces, the plates, the top steel, give us a call we can get it sorted for you
@TradeSmartHQ
6 ай бұрын
Awesome work and where is your footing?
@pauljamieconstruction1871
6 ай бұрын
Thank you. Its under the wall we removed
@RC-oi1gg
Жыл бұрын
How do you work out the steel required. Who does that calculation when planning? Thanks for the video. I have a similar job coming up.
@pauljamieconstruction1871
Жыл бұрын
You have to get a structural engineer to work out a design. Thanks mate. Let me no how it goes
@RC-oi1gg
Жыл бұрын
Thanks for getting back to me. Sorry to linger. I have a stud wall to remove and certain it’s structural. The house is a wooden brick clad building so I’m sure there are no internal block walls to support an RSJ. Is it possible to support an RSJ with timber or would it require steel uprights to carry the beam. Is it also possible to tie into an RSJ at right angles to form a T to avoid having to add a central support column below the joint? Hope that makes sense. Great video. Keep up the great work. Very informative 👍
@neilu.k.1364
Жыл бұрын
Great vid - Can I ask how you got your cuts so neat on the joists?
@pauljamieconstruction1871
Жыл бұрын
Thanks mate. I use a reciprocating saw so the blade is verticle.
@pauljamieconstruction1871
Жыл бұрын
Watch this video at 29mins kzitem.info/news/bejne/umuMrGmLgYiphWU
@neilu.k.1364
Жыл бұрын
Thanks for taking the time to reply. If for various reason the steel can’t be placed in situ before you cut the joists would you use a laser to mark all the joists ?
@pauljamieconstruction1871
Жыл бұрын
@neilu.k.1364 yes laser or chalk line. Then use a boat level to plumb a line with a pencil on each joist
@neilu.k.1364
Жыл бұрын
Thanks - new subscriber
@hichemrochedi4245
2 жыл бұрын
Amazing work
@mrssleep
2 жыл бұрын
Nice work - How much did that cost the customer? Parts and labour?
@pauljamieconstruction1871
2 жыл бұрын
Hi A Singh this project was competed about 9 months ago for 4k not including waste removal and Exclusive of the dreaded vat.
@bob6916
2 жыл бұрын
Did this pass building regs? I’m having a problem where my construction engineer is saying I will see the notch for the rsj but I don’t want to see the notch so not sure what to do
@pauljamieconstruction1871
2 жыл бұрын
If the rsj is deeper than the ceiling void, you could batten under the joists , platser board and skim. Effectively lowering the ceiling. Is this what you mean?
@bob6916
2 жыл бұрын
Did this pass building regs ? I’m having a problem where my construction engineer is telling I will see the notch for my rsj which I don’t want
@pauljamieconstruction1871
2 жыл бұрын
Hi bob, we discussed this detail with our engineer first, building control are more than happy with this detail.
@samsmith1182
2 жыл бұрын
Hi what tool did you use to cut the joists straight?
@pauljamieconstruction1871
2 жыл бұрын
Hi Sam , i used the Hilti reciprocating saw with a 225mm rigid wood blade. And kept the saw vertical. 👍🏼
@samsmith1182
2 жыл бұрын
@@pauljamieconstruction1871 Thanks mate, need to do that and all my blades I have that length always bend out at the end 👍🏻
@pauljamieconstruction1871
2 жыл бұрын
@Sam Smith yea they do a firm one for wood only with large teeth. If you get a good brand like hilti, milwaukee, then it will go through like butter.
@samsmith1182
2 жыл бұрын
@@pauljamieconstruction1871 going to get one now, thanks a lot mate
@pauljamieconstruction1871
2 жыл бұрын
@@samsmith1182 let me know how it goes.
@rich20b
2 жыл бұрын
Out of interest how much did you charge to do this job including supplying the steels?
@pauljamieconstruction1871
2 жыл бұрын
Hi Rich , this project was just under 4k excluding vat and excluding waste removal. This was completed around 9months ago. Are you doing 1?
@rich20b
2 жыл бұрын
@@pauljamieconstruction1871 thanks Paul. Yeah, though sadly not near you. Had a quote for £10k a couple of weeks ago for basically the same job!
@pauljamieconstruction1871
2 жыл бұрын
@@rich20b we can do it for 9k. 🤣, where you based
@rich20b
2 жыл бұрын
@@pauljamieconstruction1871 Birmingham way. Probably a bit far for you guys 😂
@andrewmarshall4572
2 жыл бұрын
Hi, did you need to do a footing for the posts both sides?
@pauljamieconstruction1871
2 жыл бұрын
Hi , no we managed to bolt our base plate directly onto the existing foundation. We have had it where there is no foundation because of timber floor, we had to dig 1.2m3 pit and fill with concrete
@asianking187
2 жыл бұрын
What screw did you use to screw joist to the timber in the rsj
@pauljamieconstruction1871
2 жыл бұрын
Hi we drilled through the rsj with a mag drill 14mm, then we drilled through timber with a 14mm spade bit, then bolted together with m12 coach bolts, and square washers.
@asianking187
2 жыл бұрын
@@pauljamieconstruction1871 and them small screws joining the joists with the with the joist hangers were they normal 30 mm screws?
@pauljamieconstruction1871
2 жыл бұрын
@@asianking187 yes normal twist nails on the joist hangers. Have you got one to do?
@asianking187
2 жыл бұрын
@@pauljamieconstruction1871 yes but your too far im from manchester my builder has done some absoulte cowboy job i shown him this vid and he said i know how to do it Where u jolted the two long timbers either side of the rsj He basically put one long timber ontop of the rsj and wrapped 20 joist hangers around it
@pauljamieconstruction1871
2 жыл бұрын
@YUSHUA ELIAS oh ok i understand. Hopefully building control sign it off. 🙏