Getting started on the new warehouse space: 40x72 post frame building with gambrel roof. The building site needs to be cleared and leveled, a driveway to access the site needs to be installed, and lastly the 25 24"x48" footings need to be poured.
Series Playlist: Post Frame Barn Build
• Post Frame Barn Build
Donavan's Channel - / donavanshomes
donavanshomes.com/
Unlimited Concrete Concepts - unlimitedconcreteconcepts.com
Chapters
0:00 - Site Prep
5:59 - Lumber Delivery
8:52 - Driveway Install
16:27 - Concrete Pour
Thank you to Triton Tools and Horton Brasses for sponsoring my work
www.tritontools.com/en-US
www.horton-brasses.com/
Support What I Do: www.mattcremona.com/support
Check out Wood Talk, a podcast about woodworking that I co-host:
www.woodtalkshow.com/
/ woodtalk
Website: mattcremona.com
Instagram: / mattcremona
Twitter: / mattcremona
Facebook: / mattcremonaww
Email: matt@mattcremona.com
Негізгі бет Тәжірибелік нұсқаулар және стиль Site Prep and Footings - 40x72 Gambrel Post Frame Episode 1
Пікірлер: 293