This project video shows the CAT 340 long reach in action with contractors repairing the banks at Sturminster Newton with some soil nailing stabilisation operations. The best in its class for power this machine could handle the weight of the drill mast with ease.
- Күн бұрын
Soil nailing Bank Repairs at Sturminster Newton with CAT 340
- Рет қаралды 50
Пікірлер