Techniques for plaster ceilings in construction. Nowadays, plaster ceilings are a very basic item in construction, increasing the aesthetics and luxury of the house. In addition, it also covers the dark spots on the ceiling. When installing lights above, it also makes the house look brighter. so beautiful.
Design and build: Thank you for viewing.
---------------------------------------------------------------
👉 Please subscribe to follow and support the channel.
👉 Go to the channel to watch other videos.
👉 / @design.and.build-kpm
👉 Watch similar videos.
- • What is different abou...
- • Sand cement floor roll...
- • Good tips for making b...
- • Techniques for weaving...
---------------------------------------------------
CONSTRUCTION PROCESS
1. Construction preparation phase.
- Notify the start of construction work to local authorities in writing.
- Notify neighboring households.
- Hang construction signs.
- Project information signs.
- Signs of construction regulations.
- Labor safety signs.
- Construction warning signs.
- Prepare the ground, borrow sidewalks, prepare power and water sources for construction.
- Prepare construction permit documents including:
- Construction permit.
- Drawings for construction permits.
- Prepare detailed construction design documents as a basis for construction techniques.
- Locate construction boundaries, determine standard elevation code +0.000
- Prepare labor and prepare material supply process.
- Prepare the construction process for pressing piles or Melaleuca piles (if any).
2. Construction phase of foundation and underground works
- Dig the foundation hole, dig the stirrups, pour concrete to line the foundation and the stirrups.
- Installing formwork, reinforcing steel, pouring concrete for footings and tie beams.
- Digging soil, building septic tanks and manholes.
3. Rough construction phase of the body and roof.
- Installing rebar, formwork and pouring concrete columns.
- Build walls to cover and shield the project according to technical requirements.
- Erect formwork, install reinforced beams and floors according to technical drawings.
- Installation of underground technical piping system.
- Pouring concrete for beams and floors.
- Construction of partition walls and stairs.
- Construction and installation of electrical lines and underground water pipes.
- Plastering ceilings and walls inside and outside the house.
- Construction and waterproofing of underground floors and exposed floors.
4. Construction completion phase
- Putty putty, paint ceiling, interior and exterior walls, paint doors.
- Decorative stone tiling.
- Install doors, gates, railings.
- Construction and installation of electrical equipment, water, sanitary equipment, toilets, lavabos, faucets, sinks, indoor and outdoor lighting.
- Construction and installation of wooden furniture such as kitchen cabinets, book shelves (if any)...
- Cleaning the project, fixing errors, completing and handing over the house.
---------------------------------------------------
👉 Listen to the music in the video again.
Lachaim by Kevin MacLeod is licensed under a Creative Commons 4.0 Attribution license. creativecommon...
Source: incompetech.com...
Artist: incompetech.com/
Folk Round by Kevin MacLeod is licensed under a Creative Commons 4.0 Attribution license. creativecommon...
Source: incompetech.com...
Artist: incompetech.com/
Негізгі бет Techniques of making plaster ceilings by veteran workers
Пікірлер