As part of a distribution line changeout, National Grid installs a temporary extension arm onto an existing pole and a roller for the new line onto a new distribution pole. Energized lines are then moved onto the extension arm.
- 7 жыл бұрын
Temporary Extension Arm Installation
- Рет қаралды 37,207
Пікірлер: 18