Another batch of fragments of cleaning and assembly of the IZH machine. A lot of all sorts of nuances that take a huge amount of time. The video shows about a third of the moments, the rest behind the scenes. In addition to everything shown, the bearings will most likely be replaced, it will be necessary to replace the small longitudinal T-bolts, adjust the operation of the limbs so that they do not stick during rotation.
The scraping of the machine guides is a separate protracted process, it was decided not to dive into it during the first assembly. The main task is to assemble a complete machine for work. You also gradually have to "settle in" a necessary and not very cheap tool for such work.