Mooring design is one of the biggest challenges in the floating PV market. Each project requires site-specific mooring configuration, technology and application. The FPV plant's reliability and durability throughout its lifetime depend significantly on an effective mooring system. Ciel & Terre, a leading actor in the FPV market, and INNOSEA, an offshore renewables engineering firm, have been working on innovative mooring designs and modeling in order to improve the LCOE of floating solar.
Webinar Topics
- Introduction Ciel & Terre and INNOSEA
- State-of-the-art and common challenges in floating solar mooring
- Feedback from offshore mooring expert: the added value from the marine experience
- How can integrating the environmental loads and operational constraints into the mooring design strongly improve reliability?
- Specific numerical modeling challenges in floating solar
- Next frontier: new mooring solutions
Speakers:
Félix Gorintin - Head Floating Solar, INNOSEA
Pierre-André Courbet - R&D Anchoring Engineer, Ciel & Terre
This webinar is part of Solarplaza's lead up to the Floating Solar Conference (3-4 November /// Virtual). For more information about the event and the program, please visit: www.floatingsolarconference.com/
------------------------------------------------------------------------------------------------------------------------------------------------------
🔗 Links
For an overview of upcoming events: www.solarplaza.com/events/
Sign up for our newsletter for updates: bit.ly/2UwOGy1
👍 FOLLOW US
LinkedIn: / solarplaza_2
Facebook: / solarplazainternational
Twitter: / solarplaza
Негізгі бет Ғылым және технология The Floating Solar Plant Mooring Challenge | Solarplaza Webinar
Пікірлер: 2