Greenwich Foot Tunnel
The Greenwich Foot Tunnel crosses beneath the River Thames in East London, linking Greenwich on the south bank with Millwall on the north. Approximately 4,000 people use the tunnel each day. It opened in 1902.
The tunnel was designed by civil engineer Sir Alexander Binnie[2] for London County Council and constructed by contractor John Cochrane & Co. The project started in June 1899 and the tunnel opened on 4 August 1902. The tunnel replaced an expensive and sometimes unreliable ferry service allowing workers living south of the Thames to reach their workplaces in the London docks and shipyards in or near the Isle of Dogs. Its creation owed much to the efforts of working-class politician Will Crooks, who had worked in the docks and, after chairing the LCC's Bridges Committee responsible for the tunnel, later served as Labour MP for Woolwich.
The section of the tunnel that was repaired following damage during World War II
The entrance shafts at both ends are beneath glazed domes. Lifts, installed in 1904, were upgraded in 1992 and again in 2012, and helical staircases allow pedestrians to access the tile-lined tunnel, which slopes gently from both sides down to a midway lowpoint beneath the river. The cast-iron tunnel is 1,215 feet (370.2 m) long, 50 feet (15.2 m) deep[3] and has an internal diameter of about 9 feet (2.74 m). The cast-iron rings are coated with concrete and surfaced with some 200,000 white glazed tiles. The northern end was damaged by bombs during the Second World War and repairs included a thick steel and concrete inner lining that substantially reduces the diameter for a short distance. The northern shaft staircase has 87 steps; the southern one has 100.
Before renovations from 2010 onwards, the attendant-operated lift service was only open from 7 am to 7 pm on weekdays and Saturdays, and 10 am to 5.30 pm on Sundays, with no service on Christmas Day or Boxing Day. Staff shortages and other problems meant that even during these times the lifts were often unavailable. Since 1999, if the lift was not functioning, anyone unable to use the stairs could take the Docklands Light Railway between Island Gardens DLR station (close to the northern end of the tunnel) and Cutty Sark DLR station (close to the southern end). However, non-folding bicycles are not permitted on the Docklands Light Railway system at peak times.
chhanel link: kzitem.info?even...
Greenwich Council started work to upgrade the tunnel on 19 April 2010, intending to reduce leakage, improve drainage and install new lifts, CCTV, communication facilities and signage. Completion was planned for March 2011 but this slipped to September 2011. The tunnel was supposed to be accessible throughout most of the renovations, but it closed completely in February 2011. Stair use was soon regained but lifts remained out of service until early 2012, and remained subject to occasional brief closures during 2012. In October 2012 Greenwich Council acknowledged that the upgrade work had not been completed on time and had run over budget.[4] The work was finally completed and included new customer-operated lifts with surface level availability signs, CCTV coverage, upgraded lighting and renewal or replacement of vital structural components.[1]
The lifts were out of action for a long period in 2021-22 which Greenwich Council attributed to an international supply chain problem affecting the supply of spare parts.[5]
keywords: greenwich foot tunnel, foot tunnel, greenwich, greenwich foot tunnel walk, foot tunnel greenwich, greenwich tunnel, tunnel, london foot tunnel, woolwich foot tunnel, greenwich london, the greenwich foot tunnel, greenwich foot tunnel lift, greenwich foot tunnel bikes, greenwich foot tunnel length, greenwich foot tunnel london, greenwich foot tunnel cycling, greenwich foot tunnel distance, greenvich foot tunnel, thames foot tunnel, greenwich walk, greenwich park