Background music from the Tron Legacy Light Cycle game on Disney's website. Someone asked me if there was a way to have just the music and not the light cycle game sounds and I figured out a way using my sound recorder program and allowing it to record directly from the sound outputs and not the microphone. The result is a soundtrack to the game that is isolated from the game sounds. Basically this is a portion of music that is looped continuously through the game.
- Күн бұрын
Tron Legacy Light Cycle : The Critical Path
- Рет қаралды 677
Пікірлер