The highway passes through a 5.6 km-long double-bore tunnel. Construction works on the tunnel began in May 2007 and were completed with one tunnel tube inaugurated in June 2009. The south-bound tunnel was completed in July 2010.
- Күн бұрын
Tuneli i Kalimashit | Kalimash Tunnel
- Рет қаралды 5,248
Пікірлер