Would you need to level a suspended timber floor before laying the insulation pipe boards?
@nu-heatuk
2 ай бұрын
It is advised to start with a level surface where possible, if the timber deck boarding is being lifted to install mineral wool below this offers a good opportunity to correct deviations in floor levels, screw down any uneven floorboards or if required replace with a T&G chipboard deck, level the deck using self-levelling compound where required.
Пікірлер: 2