Visualization of the expressway S17 section from Izbica interchange (without interchange) to Zamość Sitaniec interchange (with interchange) (section 4). GDDKiA website: gov.pl/web/gddkia/s17-izbica-bez-wezla--zamosc-sitaniec-z-wezlem
When receiving the Design planning, the following were modified:
- separation of the function of the animal crossing combined with the crossing at km 2+113.99 - localization of the animal crossing at km 0+030 as a lower crossing with parameters compliant with the requirements of the Environmental Decision (DŚU), with continuation of the crossing under the planned parallel continuity of DK17
- separation of the function of the animal crossing combined with the crossing at km 3+815.07 - the animal crossing should be located at approx. km 5+500 as an upper crossing with parameters compliant with the requirements of the Environmental Decision (DŚU)
Source: Project of S17 section Izbica (without interchange) - Zamość Sitaniec (with interchange) prepared by the design office Mosty Katowice Sp. z o.o. commissioned by the GDDKiA - State Treasury.
Негізгі бет Ғылым және технология Visualization of S17 Izbica - Zamość -- up-to-date (12/2022)
Пікірлер: 1