I'm having this done by a licensed electrician BUT this video was extremely informative. Thank you. I now know what the level of effort and work is and will be able to solicit bids with a good understanding of what to expect. I look forward to seeing the 22Kw video.
@electricianron_New_Jersey
Жыл бұрын
JC, thanks for the compliment on the video. How did your generator turn out?
@takearidewithme3589
Жыл бұрын
Thanks for these great videos. I am currently an HVAC guy studying for the masters electrician exam visualizing the main bonding jumper helped thanks
@electricianron_New_Jersey
Жыл бұрын
Always remember that current returns to the source.
@waterboy74
Жыл бұрын
Did you have to get an inspection before power was turned back on after the ATS install and then again after the generator was done or just one inspection after everything was finished?
@electricianron_New_Jersey
Жыл бұрын
Just one inspection
@aksuarezjd
9 ай бұрын
I just did this but in my case, since I had the same situation and did not want to install it outside flush with a window (leaving room for service on both sides of electric distribution panels) I simply worked it all inside the house. I slid my former main panel 7 inches to the side (romex allowed some play) and installed the SER 200AMP ATS to the SEC coming from the meter. So, the ATS is now where the former main panel was and the "breaker panel" (now subpanel) is next to it, connected with a 2". I did not have to mess with the connections at the meter and all I had to do is scoot the "breaker panel" to the side and insert the ATS where it was to meet the (SEC) wires coming from the meter. Looks tidy and passed with flying colors. I did not want to have my main disconnect outside. I helped a friend install his a few years ago and in his case we put a 200AMP safety switch (disconnect) outside and then from that disconnect we ran the wires to the ATS inside. It was an additional $110 but the beauty is that if he ever needs to work on the ATS or replace it, he can kill the juice without having to remove the meter.
@johndunham2237
Жыл бұрын
Since I have been installing generacs now for over 7 yrs I don’t use open service cable because of the deterioration of the jacket to allow wicking all the way down to the panel and I deox all my lugs the corrosion on the neutral in the panel was alot
@johndunham2237
Жыл бұрын
And I also take out the guys in the transfer to make it lighter and also so I don’t get metal shavings in the transfer equipment
@johndunham2237
Жыл бұрын
Guts not guys
@electricianron_New_Jersey
Жыл бұрын
It has to be installed correctly. SEU/ SER is a listed product identified for use as service equipment.
@johndunham2237
Жыл бұрын
I know but as an almost 40 yr electrician and also a contractor I have seen the cost effectiveness and longer lasting if all the outside electrical is in a conduit and not a cable netter value for the customer I always used cable only until I have seen the damage to the main panel from wicking from the breakdown of the outer sheath and yes it is still by code I was just giving my 2 cents in on a vid some customers are on a bit of a budget so I understand good job
@noereyes2051
5 ай бұрын
Greetings from Montréal Canada 🇨🇦 I always watch your videos God bless you
@electricianron_New_Jersey
5 ай бұрын
Thank you!
@ibewsparky4
Жыл бұрын
I ALWAYS DOUBLE TAP MY NEW GROUND BARS ALSO
@jcaleca60
2 жыл бұрын
Getting a license in New York City with hard in New Jersey do they still have the open book test
@victorcruz9644
2 жыл бұрын
Very good job but how put the wires to the generator to start/stop the engine for standby ??? thanks ...I can do the electrical I'm an electrician but my problem is that one for the generator to be in standby to kick start the generator....
@ptrollan
3 жыл бұрын
Great video Mr. Electrician !!!!! May I suggest some O'Keefe's hand cream and fingerless working gloves !!!!
@camilo8cheryl
9 ай бұрын
Thats the most painful job i did when installing generators🤦🏻♂️ un-bonding neutral and ground at the main distribution panel
@abrelectric
2 жыл бұрын
I love the regional differences. In Texas, we can't run surface-mounted SER cable. It has to be concealed or in conduit. Keep the bass lines rolling!
@electricianron_New_Jersey
Жыл бұрын
Obviously, we have some limitations with the SEU cable. For one, where's its subject to physical damage, like on the driveway side of the house where it is feasible that a car could actually hit the cable, in that situation it will not pass inspection. Also, in New Jersey we abide by the Uniform Construction Code which in turn adopts the NEC. Some stuff is never adopted and some stuff is changed to meet the existing situation (like clearances for electrical panels in basements that are less than 6' tall, for example). We also have a Rehab Sub Code which allows for existing structures and a whole other set of rules outside the parameter of the NEC.
@abrelectric
Жыл бұрын
@@electricianron_New_Jersey yes, why not have yet another set of guidelines;)
@kamakaziozzie3038
Жыл бұрын
My AHJ here in CA wont allow it either- it sure would make things easier in some circumstances! What I found most interesting was the analog meter. I love those things but rarely ever see one anymore. When they did the transition to digital meters in 2011 the only way a customer could keep their analog meter was to pay a one time $75 fee and $10 per month afterwards. That lasted until about 2015-16 when a class action lawsuit was settled and they told people they didn't have to pay "anymore";) by then >99% of all households had a "smart" meter. SCE and PG&E ended up getting what they wanted after all- and millions in additional fees to boot
@enriquecastillo986
3 жыл бұрын
You're allowed to used SER exposed in NJ?
@electricianron_New_Jersey
3 жыл бұрын
Of course. It’s real popular here in the northeast. We have aluminum and copper SE available.
@keyassetprotection6865
3 жыл бұрын
Thank You. Looking forward to the run to the generator
@electricianron_New_Jersey
Жыл бұрын
Have you watch part two?
@Ozzy2341
2 жыл бұрын
Great video , any benefits of using aluminum conductor verses copper conductor ? Thanks
@electricianron_New_Jersey
Жыл бұрын
Copper is a better conductor of electricity but can be very expensive.
@randallthompson1842
3 жыл бұрын
So do you add the neutral from the meter and the neutral from the service entrance cable on the lower bar and just the ground to the top. I know they are connected by the green wire but I didn’t see you connect the service entrance neutral or ground so I was wondering
@jpl57210
3 жыл бұрын
Hello. Great video. I just got the same transfer switch. 14kw generator won’t have until November. So it’s okay to install this now? And the house will still function normal? And then add the generator later. Thanks!
@electricianron_New_Jersey
3 жыл бұрын
There will no problem in doing that. Whenever I do a whole house generator I usually install the transfer switch the first day and the generator install the following day.
@bernlitzner2739
3 жыл бұрын
Could you explain WHY this is necessary? What about home generators installed before this NEC update? I just had a 12kw Briggs & Stratton put in, 150amp xfer switch wired to a new panel that was installed last December. The original four fuse panel (inside a kitchen cupboard) went back to 1952. The home currently is 95% 12-2 in its wiring. (no ground)...with 2 prong outlets. Appreciate any insight in this matter as I'm trying to grasp and learn the purpose for doing this.
@electricianron_New_Jersey
3 жыл бұрын
Grounding is necessary to clear a GROUND FAULT and prevent electrical shock. The equipment grounding conductor (EGC for short), is a non-current carrying path for fault current to clear a fault.
@jfowler702910
Жыл бұрын
How come you didn't show the landing of the SER cable connections into the old main panel?
@electricianron_New_Jersey
Жыл бұрын
4-wire
@jfowler702910
Жыл бұрын
@@electricianron_New_Jersey yes SER. SER is 4 wire SE cable & SEU is 2 wire SE cable. Why did you not show connecting it into the panel?
@tomdavis7655
2 жыл бұрын
Great video....can I use a different transfer switch with briggs and stratton standby generators
@electricianron_New_Jersey
Жыл бұрын
I'm sure you can but I'd play it safe and use the transfer switch recommended by the manufacturer of the generator.
@vince6829
2 жыл бұрын
Awesome job! Thank you for sharing.
@electricianron_New_Jersey
Жыл бұрын
thank you Vince!
@callapygian
3 жыл бұрын
What do you do when the meter head is integral with the service entrance panel?
@electricianron_New_Jersey
3 жыл бұрын
Without seeing it I’d have to plan to redo the whole service without a meter/ main combination if your transfer switch is to become the main disconnect.
@Ozzy2341
2 жыл бұрын
Great video, what are the specs of the wire used in this installation? Thanks
@electricianron_New_Jersey
Жыл бұрын
The service-entrance conductors are 4/0 aluminum SEU cable, the feeders to the existing panel are 4/0 SER cable, and the feeders out to the generator are #4 copper. The control wiring is all #14AWG copper stranded THHN/ THWN.
@gerardotorres7904
Жыл бұрын
Why using aluminum wire and not copper?
@kamakaziozzie3038
Жыл бұрын
price
@stanleykania7184
Жыл бұрын
Gotta wire up one 2023
@electricianron_New_Jersey
Жыл бұрын
I’m doing one next week!
@antonioduran1016
3 жыл бұрын
You didn't show how you hookup the transfer switch control
@electricianron_New_Jersey
2 жыл бұрын
T1 is the battery charger, N1 & N2 are the 240 volt sensing conductors that tells the generator when utility power has been lost and when it returns. 0 is the low voltage ground, 94 is the 12 volts that opens and closes a set of contacts that turns the generator on and off, and 23 is the actual transfer. These (6) conductors terminate between the transfer switch and the generator. That's all you have to do is connect them at each end. The actual transfer takes place by wiring already in place and goes into greater detail at the schooling Generac provides for its individual dealers and service technicians. I hope this was helpful.
@ED-uk6lv
2 жыл бұрын
How do you wire the control wires when you have two transfer switches on a 22k generator. It’s for a 400 amp service with two 200Amp main electrical panels. Thank you!
@7951miguel
2 жыл бұрын
Que calibre de cable se utiliza para el tranfer??
@bobrub
2 жыл бұрын
Hey Ron, I'm recently sub'd to you and really enjoy your content style and background music and totally love the on screen printed follow up notes along with your verbal description of your actions. Please keep it up and you will go far. I guess all these Gensets are NG fed aren't they? Do you do the gas work there or plumber or who? Is that piped in before you do electric or after?
@electricianron_New_Jersey
2 жыл бұрын
I don't do any of the gas piping. I've studied the requirements for the specific kilowatt size generators so I know what size piping the plumber must install but any further from that I dont get involved in it. A properly sized gas main is also crucial to a good installation.
@ignacioortiz6222
2 жыл бұрын
Just wondering, no need for a sub panel?
@electricianron_New_Jersey
2 жыл бұрын
The distribution panel became a “sub panel” when the main bonding jumper was removed and grounds and neutral conductors were isolated from one another.
@keepingytcensorsbusy761
2 жыл бұрын
Crazy to see what's allowed under different AHJ, just running exposed SER on the side of a house like it's nothing
@EddyForero07
2 жыл бұрын
yes, its allowed but you can always dress it up a little better and not just make a bridge in the air like this one. just a thought.
@stuff8195
6 ай бұрын
Control wiring?
@stanmoney8470
2 жыл бұрын
Why your pulling a meter if your just installing a tranfer switch??
@electricianron_New_Jersey
2 жыл бұрын
Because the load side service-entrance conductors (the conductors between the meter and the circuit breaker panel) gets removed and relocated to the automatic transfer switch.
@kamakaziozzie3038
Жыл бұрын
to lessen your chance of electrocution
@donreed4885
3 жыл бұрын
Why would you add a ground bar if you are going to leave the bonding screw in. The ground bar will have the same potential as the neutral as long as the bonding screw is installed.
@electricianron_New_Jersey
3 жыл бұрын
The bonding screw is removed in the distribution panel and the bonding jumper is in the main disconnect. Btw, it is always in the main disconnect.
@jcaleca60
2 жыл бұрын
I wouldn't want to take that license exam again but I made it now I'm retired
@lebowenman1
3 жыл бұрын
What size service wire is that?
@electricianron_New_Jersey
3 жыл бұрын
4/0 aluminum from the ATS to the utility meter.
@lawoull.6581
2 жыл бұрын
With these new meters you can't pull out...w/o pulling a permit...but old watt meters you can get by cutting tag..power company shows up soon. As you pull new ones...lol...ithink they have a sim card...
@electricianron_New_Jersey
2 жыл бұрын
No problem at all. I have a license to do this work and an electrical permit to do this work. I'm also a small dealer (factory trained) for Generac. I believe I am more than qualified for this application. This job also passed on the first inspection for fire, building, mechanical, and electrical.
@lawoull.6581
2 жыл бұрын
@@electricianron_New_Jersey I am looking apprentice...are you interested 🤣
@robertbeyers1308
Жыл бұрын
I saw a lot of errors in this video. The main are I noticed was that this guy did not use electrical conduit to put the main conductors in. With the sun beating on the cable. All that plastic becomes brittle. Therefore with a proper electrical conduit will be the correct answer to protect the wiring. This guy clearly did not know how to obey electrical building code. So make sure you obey all it was going to building code and have the proper inspection every time. P. S. Every location in the world has different rules and regulations. Please check in with your building inspectors or Building Department to find out what the actual building code is for your actual area. And if you are not sure if that your electrician do the job correctly. You have a legal right to contact the building inspector themselves. Inorder to have the work inspected. For a peace of mind.
@electricianron_New_Jersey
Жыл бұрын
Oh, you're cute. In what world do you review electrical work? You should familiarize yourself with the National Electrical Code, specifically section 230.43 which lists approved wiring methods and service-entrance cable is listed for service equipment. For more information you should see DCA's website before popping off about building departments, inspections, and construction officials. P.S. Where are you a licensed electrical contractor?
@Harrison2253
11 ай бұрын
Hey genius, lots of errors ? FYI SER has the same outer covering as the service cable (SEU) that enters and exits the meter pan. Perfectly legal to use it exposed on a house just like its cousin SEU. Its sunlight resistant and lasts just as long. What are all the other errors ?
@merllhagard6799
2 жыл бұрын
slick work and nice video. good stuff.
@alanb.4660
3 жыл бұрын
you have E1 and E2 in the video...I think you meant T1 and T2
@lawoull.6581
2 жыл бұрын
E1 and E2 are for load (inside house panel)and T1 and T2 are for generator...I believe
@funny524k
3 жыл бұрын
Use RMC we could never get away with that installation
@electricianron_New_Jersey
3 жыл бұрын
Guess you don’t know the NEC very well. Also, codes vary from state to state and I don’t know anyone using ridged metallic conduit for an air-cooled standby generator.
@funny524k
3 жыл бұрын
@@electricianron_New_Jersey good to have all service entrance conductors in rigid
@electricianron_New_Jersey
3 жыл бұрын
@@funny524k its good to have ALL copper conductors too. Again, not required.
@funny524k
3 жыл бұрын
@@electricianron_New_Jersey I only use copper conductors. Lol
@funny524k
3 жыл бұрын
We can all agree code is minimum requirements
@cawbaird5711
Жыл бұрын
That don't look like 2 ought aluminum
@electricianron_New_Jersey
Жыл бұрын
It’s not. It’s 4/0 Aluminum!
@blakesbaseball6643
2 жыл бұрын
Number 6 all that's required to electrodes
@electricianron_New_Jersey
2 жыл бұрын
To ground rods that's all that's required. There's all different sizes required depending on the size of the service conductors. NEC 250.66
@blakesbaseball6643
2 жыл бұрын
Nolan not mandatory
@jamescarrano2242
2 жыл бұрын
should have changed the whole service , that ser cable is crap , the connector was loaded with duct seal which was obviously carrying water into the panel evidenced by the rust spots in the panel
@electricianron_New_Jersey
2 жыл бұрын
sure, I'll email you the invoice.
@bigtroll8249
9 ай бұрын
@@electricianron_New_Jersey😂 lmao, Ron ur hilarious!
@annafraley5388
Жыл бұрын
Nice Job there and N1CE SET UP TOO @ 4:49 ✅ Only Problem is I Can’t Read that Phast…!!! 🤷🏻♂️🫣🤔
Пікірлер: 92