Who engineered this new weir, and who approved its location?
@freelancerider100
Жыл бұрын
As for the second weir construction, the site for the construction is at the bend of the canal, the soil out there has no real structure and can be completely washed out from saturation. What kind of piering is being used to prevent the small stretch of material between the two weirs to prevent a full on breech of the canal bank? What would be the result from a breech of the canal at that location? When the new wier is complete will both be used simultaneously?
@freelancerider100
Жыл бұрын
The 1907 flood, the carson river skipped its usual path and flowed from hazen to the sink directly....
@larrynorby9996
Жыл бұрын
Your audio is terrible..
@misctimetraveler
Жыл бұрын
the flooding will be different compared to if it comes over the dam or over the canals or over the river
@misctimetraveler
Жыл бұрын
that was useless video. no sound to start. a little better with other people
@liftyourvoice04
Жыл бұрын
The audio quality is very choppy and hard to hear. Any chance there is a transcript available?
@EdwinBurchard-uu9vf
Жыл бұрын
What do you think?
@freelancerider100
Жыл бұрын
I think the second weir location is likely to cause a breech in the v-line
@misctimetraveler
Жыл бұрын
I wonder why we can see this needed to be started earlier but they always wait