How to Calculate Hot Metal Production | Blast Furnace | Tech It Eze
Hi Friends
Aaj hum discuss karenge blast furnace mein , Kaise hot metal generation calculate karte hai
Ek charge ka Ek ghante ka, ek shift ka aur ek din ka
Kaise Slag generation calculate karte hai
Ek ghante ka, ek shift ka aur ek din ka
Chaliye shuru karte hai ek example se
Pahle dekhenge sinter ek charge mein kitna ja raha hai
Suppose twenty four thousand kg per charge
Ab dekhna ye hai ke Sinter mein moisture kitna hai
Suppose sinter ka moisture one percent hai
Then dry sinter kitna hoga?
twenty four thousand kg Sinter ka one percent minus ho jayga
matlab twenty four thousand kg sinter minus two hundred forty kg
ya ni twenty three thousand seven hundred sixty kg Sinter
now sinter ka F E percent kitna hai?
Suppose Sinter ka F E fifty six percent
Then Sinter mein total F E kitna hoga?
Thirteen thousand three hundred and six kg
Abhi hot metal ka yield nikal na parega
Hot metal ka yield kaise nikal te hai?
Pahle hot metal ka sabhi components ke analysis ko jor na parega
Jaise ki carbon, silicon , Sulphur, manganese, phosphorous, titanium etc.
Phir one hundred se uss total ko minus karna parega
Result jo nikle gaa utna percent hot metal yield hai
Jaise yahaan humne pakra hai ke
Carbon 4.4 percent, Silicon 0.8 percent, Sulphur 0.04 percent, manganese 0.4 percent, phosphorous 0.145 percent, titanium 0.1 percent
Total five point nine percent
Abhi
100 minus 5.9 percent equals to 94.1 percent
Ab agar hum total F E ko hot metal yield se divide kar denge to humen Sinter se kitna hot metal banega wo mil jayega.
Total Sinter F E 13306 kg ko agar hum yield 94.1 se divide karenge to 14140 kg hot metal milega
Similarly
Pellet 7000 kg per charge se 4713 kg hot metal banega
aur iron ore 2000 kg per charge se 1252 kg hot metal banega.
Total 33000 kg iron bearing raw material se 20105 kg hot metal milega.
So, 1 charge mein 20105 kg hot metal yaani 20.1 ton hot metal milega.
Note: alag alag plant me raw material ka analysis alag alag hoga
Abhi humko hot metal per charge mil gaya hai 20.1 ton
Number of charge ek ghanta mein kitna gaya?
Suppose 6 charge jaa raha hai yaa gaya hai
Then hot metal kitna generate hoga?
ek charge ka hot metal banega 20.1 ton
so, 6 charge ka banega , 20.1 ton multiply by 6 equals to 120.6 ton
Note: raw material analysis , charge per hour, hot metal per charge fixed nahi hai. Burden, analysis our furnace size aur blast parameters ke upor depend karta hai.
Abhi humko hot metal per charge mil gaya hai 20.1 ton
Hot metal ek ghante ka mil gaya hai 120.6 ton
Number of charge ek shift mein kitna gaya?
Suppose 6 charge karke total 48 charge gaya hai
Then hot metal ek shift mein kitna generate hoga?
ek charge ka hot metal banega 20.1 ton
so, 48 charge ka banega , 20.1 ton multiply by 48 charge equals to 965 ton
then hot metal shift mein 965 ton generate hoga
Abhi humko hot metal per charge mil gaya hai 20.1 ton
Hot metal ek ghante ka mil gaya hai 120.6 ton
Hot metal ek shift ka mil gaya hai 965 ton
Now, Number of charge ek din mein kitna gaya?
Suppose 6 charge karke total 144 charge gaya hai
Then hot metal ek din mein kitna generate hoga?
ek charge ka hot metal banega 20.1 ton
so, 144 charge ka banega , 20.1 ton multiply by 144 charge equals to 2894 ton
then hot metal ek din mein 2894 ton generate hoga
aise hi aap bhi aap ka plant ka burden aur analysis dekh ke calculate kar sakhte hai
please try kijiye,
Abhi hum slag generation calculate karenge
Per charge per hour per shift per day
Ab humein pata hai ke hot metal per charge kitna hai
Hot metal per hour kitna hai
Hot metal per shift kitna hai
Hot metal per day kitna hai
Suppose slag rate aur slag volume 360 kg per ton of hot metal hain
Then ek charge ka slag volume hoga hot metal per charge into slag rate equals to 20.1 into 360 equals to 7.2 ton
Ek ghanta ka slag volume hoga 120.6 into 360 equals to 43.4 ton
Abhi aap calculate karke batao slag generation shift mein kitna hoga?
slag generation din mein kitna hoga?
Comment mein likhiye
#howtocalculate #howtocalculatehotmetal #blastfurnace #blastfurnacepractical #techiteze #engineeringstudent #btech #metallurgy #ironmaking #hotmetalgeneration #howtocalculatehotmetalgeneration #technicalvideosinhindi #technicalvideos #blastfurnaceoperation #blastfurnacetraining #productioncalculation