Final details of the building of Barrelback 19 "Fly Boy". Then, photos and videos of the launch and first sea trials of the vessel which took place June 21, 2017.
Update January 2023: After 5 seasons of fun with this boat it is still performing very well. Most trips involve salt or brackish water and so I thoroughly flush engine, hull and trailer after each use. I also inject fresh grease into the trailer wheel bearings after each use. Had to replace one brake caliber on the trailer because it seized but only needed to clean the other one.
Негізгі бет Jim's Barrelback Build Part 3 of 3
Пікірлер: 110