I love those old style rigs...that was a pretty good connection
@nilugajjar8205
4 жыл бұрын
Nice work
@Popup98
6 жыл бұрын
Doubts clarified sir thankyou
@bypetroil
4 жыл бұрын
which company is this?
@brucemorris6319
3 жыл бұрын
Wish I had a dollar for everyone of them I’ve done I would be rich.
@RockymountainRobert
Жыл бұрын
Every connection, same here
@kevintucker2426
Ай бұрын
same here
@bobtinsley7035
3 жыл бұрын
Turn it to the right
@godngunclinger
Жыл бұрын
awwwe not showing picking up another pipe for the rat hole
@dalvirsingh8797
3 жыл бұрын
What's going on process in if rh dp
@epistte
Жыл бұрын
The crew added another 30' length of drill pipe to the drill string so the well could continue to get deeper. To accomplish that they first must pull up the kelly(octagonal rod and the kelly busing) and then connect the new piece of drill rod that was prepared and waiting in the mousehole. Then it was run back in the hole and the drilling continues for another 45 minutes and they do it again. At the very end, the crew used a pry rod to connect the kelly bushing to the drill table because it is the drive table that rotates the entire drill string.