During the storm Vaia, in October 2018, the creek Fersina in Trentino (Italy) destroyed the bridge connecting S.Orsola Terme with Fierozzo. The team of Cristelli was commissioned to transport the new structure along the dirt road leading to the bridge and to set it with a 150 tons autocrane.
Негізгі бет Автокөліктер мен көлік құралдары Oversize transport and lifting operations with autocrane on a bridge in Trentino, Italy - Cristelli
Пікірлер