For our final project of the 2022 paving season, we paved a day care parking lot. We ripped out the existing parking lot, graded it, then paved two lifts of asphalt.
Featured Equipment:
2022 Yanmar VIO 35 Mini Excavator
2020 RD12 Wacker Neuson Roller
2022 Cat CB 2.7 Roller
2019 Mauldin Paver 1550 D
2022 Weiler Paver P65
2022 Cat Skidsteer 262 D3
2021 Wacker Neuson Diesel Plate 6555
2022 Yanmar 10 Ton Excavator with Rototilt R3
2022 Western Star 4900 Tri Axle
2022 International HX Tri Axle
Негізгі бет PAVING A DAY CARE PARKING LOT - 3 DAY PROJECT: Rip Out, First Lift & Second Lift
Пікірлер: 60