Paintwork continues, with the forward radome, leading edge slats, walkways, and corrosion touchups.
- 4 жыл бұрын
A-6E Intruder Build 15 - Moar Painting
- Рет қаралды 9,187
Paintwork continues, with the forward radome, leading edge slats, walkways, and corrosion touchups.
Пікірлер: 29