Very well explained Marius. Nothing like visuals to hammer home a concept.
@007pieta
7 ай бұрын
Thank you very much. The value that you put into “ inverter power limiter “, will that prevent to much load going through inverter? If my essential load is 3000w and my not essential load requires 4000w, for a few minutes, ( inverter is 5000w) will it be controlled by inverter or will it damage inverter? Presuming the panels are producing more than 5000w.
@dama054
7 ай бұрын
Hi can you use the sunsynk with a grid tied inverter off grid like the victron
@KenIronside
7 ай бұрын
Hi Marius, thanks for this, it's useful. Can you explain what the 'Priority Battery' vs 'Priority Load' setting does? Thanks
@jarredtyson6550
5 ай бұрын
Priority load selected should send PV production to AC load first before it sends to battery ( load requirement must be satisfied first before battery can receive PV power)
@VliengWieng
5 ай бұрын
Is this the new "Limit to home" setting on the sunsynk software?
@beefycuts2100
8 ай бұрын
This will not be applicable when the whole house load is running on Essential.
@greenpro-greenproconsultin7420
8 ай бұрын
Correct. In that case you will probably not activate push back (Not tick "Zero export"), and the CT is ignored in any case.
@beefycuts2100
8 ай бұрын
Thank you, I just want to verify something, I run my home off a 16kw SS, everything essential, I do not export to sell, but I have a pp meter, and without the ct connected and a 20w grid trickle, the pp meter go into error mode. Everything works 100% now with the ct connected and 20w grid trickle.
Пікірлер: 9